Home                    Privacy                 Contact Us             
TSX:ELR: C $1.17 -0.05 AIM:ELR: GBP 79.0237 +0.0237 JSE:EPS: SAR 1000 - 40
Current Platinum Price: US $ 1554.0
REQUEST MORE INFO
Name:
Email:
About Us Projects Corporate Responsibility PGM Market Investors Media
Media

2007

More High Grade Platinum-Rhodium Rich UG2 REEF Intersections Reported at Spitzkop.

May 16, 2007
Mr. Ian Rozier, President and CEO of Eastern Platinum Limited ("Eastplats") is pleased to report on the results from the third and fourth batches of assay results received from the infill drilling programme at the Spitzkop platinum group metals ("PGM") project in South Africa. Spitzkop, located near Steelpoort in the eastern limb of the Bushveld Complex is a high grade, platinum and rhodium rich, shallow dipping, surface accessible PGM deposit with a Measured Resource in the UG2 Reef.

Infill drilling has been conducted across the property to further evaluate the grade, reef continuity, dip and content of individual PGM in the UG2 Reef. The results of the first batch of assay results from twenty-four UG2 reef intersections were reported in a news release dated November 8th, 2006, and assay results from sixty-seven UG2 Reef intersections were reported on January 30th, 2007. The third and fourth batches of results reported herein are derived from a further seventy-one reef intersections sampled and assayed from the UG2 Reef at Spitzkop. Thirty-three holes of the most recent drilling programme also intersected the Merensky Reef which overlies approximately 815ha (87.5%) of the area underlain by the UG2. The assay results from fifty-eight intersections from these holes will be reported in a future news release. It is considered that the Merensky Reef could add considerably to the Spitzkop PGM resource base.

The recent assay results continue to confirm the high PGM grades, particularly the high platinum (56%) and rhodium (8%) content of the UG2 Reef , and also that the PGM grades and widths in the UG2 are consistent with previous work reported by Eastplats and Impala Platinum.

Stated Ian Rozier, President and CEO of Eastern Platinum Limited, "These results are important in that they greatly increase our confidence in the overall continuity of the UG2 Reef across Spitzkop as well as confirming its general high grade and high platinum-rhodium content."

As part of the ongoing feasibility study for Spitzkop, the objectives of the infill drilling program were to;
  • Confirm the continuity of the UG2 reef;
  • Confirm general high PGM grade of the UG2 reef across the property;
  • Confirm the high platinum and rhodium grades in the UG2;
  • Evaluate reef thickness and continuity of the Merensky Reef;
  • Evaluate the grade profile across the Merensky Reef;
  • Provide core samples for metallurgical and rock mechanics testing.
Drilling was conducted by Geosearch, a division Transbor (Pty) Ltd. On site geological work and supervision was carried out by MSA Geoservices under the direction of Davminex Mineral Consultants (Pty) Ltd. Assaying was conducted by Set Point Laboratories, S.A.

The data generated from the 2006/7 drill progamme will be used for mine planning for the Northern Block at Spitzkop where the UG2 reef outcrops on surface and extends to a depth of 350m at a dip of between 11º and 14º, and for longer term mine planning for the deeper sections.

For the UG2 the objective was to obtain four reef intersections from each hole. Intersections of UG2 Reef from the motherhole and two deflections were usually sampled and sent for assaying. The intersected reef in the third deflection of each hole will be subjected to metallurgical or rock mechanics testing. It should be noted that in some instances where the reef was intersected at a shallow depth it was not possible to insert the required number of wedges in the mother hole to achieve the desired number of reef intersections. In such cases the drill rig was successively moved approximately a metre from the previous collar position and new holes were drilled from surface to obtain the necessary reef intercepts. On rare occasions where core recovery of 100% was not achieved because of either poor ground conditions or unacceptable drilling practice in any reef intercept, the intersection was repeated by completing another deflection. Thus, in some instances more than three deflections had to be drilled to achieve to proper QA/QC.

The assay results from the UG2 are reported on a 4 ELEMENT basis ("4E"g/t), with average mineral content of individual PGM elements or "prill splits" being expressed in percentage terms. For purposes of clarity, all the holes drilled are reported and if no sampling or assaying was undertaken the reasons are provided.

Summary of drill/assay results from the UG2 are appended to this news release in Table 1. With reference to the reported results, the following should be noted;
  • As stated, the UG2 Reef widths are "intersected" widths.
  • All holes are vertical.
  • The UG2 Reef at Spitzkop dips between 11º and 14º.
  • The average metal contribution or 'prill splits' for the UG2 Reef intersections are:
    Pt 56%; Pd 35%; Rh 8%; and Au 1%.
Mining on Spitzkop is envisaged to start via decline operations that will exploit high grade PGM resources in the UG2 Reef at relatively shallow depth without the requirement for high capital cost mine-shaft infrastructure and underground pre-production development. Spitzkop is situated updip of, and adjacent to, the Kennedy's Vale project owned by Barplats Investments Limited ("Barplats"), in which Eastplats owns a 69% indirect interest with pending transactions to increase this to 85% (News Release dated March 7th, 2007). Kennedy's Vale and the deeper sections of both properties could utilize the twin vertical shafts that already exist at Kennedy's Vale. This infrastructure would result in a significant reduction in capital costs for the development of deeper sections at Spitzkop.

Eastern Platinum Limited trades on the TSX and AIM Stock Exchanges under the trading symbol ELR and is on the S&P TSX Composite Index.

The qualified person having prepared the contents of this news release is Mr. Ian Rozier, B.Sc.(Hons), M.Sc., P.Eng.

For further information contact:

Mr. Ian Rozier, M.Sc., P.Eng., President & CEO
Website: www.eastplats.com
Email: info@eastplats.com
#501-837 West Hastings Street,
Vancouver, BC, Canada, V6C 3N6
Tel: (604) 685-6851, Fax: (604) 685-6493

NOMAD: Canaccord Adams Limited, London
Tel +44 20 7050 6752
Email:
Robin.Birchall@canaccordadams.com
Clayton.Bush@canaccordadams.com


Caution Regarding Forward Looking Statements:
Safe Harbor Statement under the United States Private Securities Litigation Reform Act of 1995: Except for the statements of historical fact contained herein, the information presented constitutes "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements, including but not limited to those with respect to the price of gold, silver and copper, the timing and amount of estimated future production, costs of production, reserve determination and reserve conversion rates, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievement of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, risks relating to the integration of the acquisition, risks relating to international operations, risks relating to joint venture operations, the actual results of current exploration activities, actual results of current reclamation activities, conclusions of economic evaluations, changes in project parameters as plans continue to be refined, future prices of gold, silver and copper, as well as those factors discussed in the section entitled "Risk Factors" in the Form 20-F as on file with the Securities and Exchange Commission in Washington, D.C. Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated and Inferred Resources:
This presentation uses the terms "Measured", "Indicated" and "Inferred" Resources. U.S. investors are advised that while such terms are recognized and required by Canadian regulations, the Securities and Exchange Commission does not recognize them. "Inferred Resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Resources may not form the basis of feasibility or other economic studies. U.S. investors are cautioned not to assume that all or any part of Measured or Indicated Resources will ever be converted into reserves. U.S. investors are also cautioned not to assume that all or any part of an Inferred Mineral Resource exists, or is economically or legally mineable.


TABLE 1
SUMMARY OF DRILL/ASSAY RESULTS - UG2

                                   Av.
Hole               Depth to     Grade      Intersected
Number           Top of UG2    4E(g/t)   Reef Width (m)
--------- ----------------- --------- ----------------

SP35                 515.26      5.93             0.81
SP35U1               515.23      8.58             0.71
SP35U2               514.99      6.92             0.78
SP36                 380.20      5.51             1.11
SP36U1               379.58      5.21             0.63
SP36U2               380.25      8.13             1.12
SP37                 496.71      3.76             0.33
SP37U1               496.56      4.44             0.71
SP38                 238.66      6.58             1.05
SP38U1               238.75      4.66             1.11
SP38U2               238.76      7.07             1.06
SP39U1               372.99      7.94             1.02
SP39U2               372.80      6.37             1.01
SP39U3               372.95      6.91             0.99
SP40                 513.98      7.21             1.24
SP40U2               514.13      6.97             1.25
SP40U3               513.78      6.50             1.18
SP41                 766.36      5.44             0.63
SP41U1               766.39      4.67             0.75
SP41U2               766.60      4.76             0.86
SP42                 636.61     20.83             0.96
SP42U2               636.55      8.39             1.00
SP42U3               636.92      7.03             1.09
SP43                 551.90      5.28             0.88
SP43U1               551.95      6.16             0.89
SP43U3               552.03      5.43             0.80
SP44           UG2 potholed                Not sampled
SP45                 549.89      7.96             1.38
SP45U1               550.03      6.21             1.35
SP45U3               549.56      6.77             1.25
SP46                 706.44      5.01             1.16
SP46U1               706.31      6.90             1.17
SP46U3               706.27      5.76             0.98
SP47U1               482.37      6.01             1.23
SP47U2               481.37      7.13             1.09
SP47U3               482.19      8.68             1.50
SP48        UG2 faulted out            Not intersected
SP49           UG2 potholed                Not sampled
SP50           UG2 potholed                Not sampled
SP51           UG2 potholed                Not sampled
SP52                 554.95      6.07             0.91
SP52U1               555.18      6.89             1.09
SP52U2               554.98      7.59             1.01
SP53                 582.58      6.88             1.04
SP53U2               583.11      6.37             0.95
SP53U4               582.44      4.83             0.99
SP54                 624.01      5.10             0.29
SP54U1               624.27      4.68             0.40
SP54U2               624.09      4.50             0.30
SP55                 633.50      6.66             0.89
SP55U1               633.60      5.84             0.90
SP55U3               633.76      7.20             1.08
SP56                 621.33      7.78             0.78
SP56U2               621.49      6.18             0.93
SP56U3               622.10      8.19             0.99
SP57                 236.02      6.76             1.18
SP57U1               236.09      5.87             1.14
SP57U2               235.68      6.69             0.93
SP58                 689.23      7.61             0.79
SP58U1               689.03      6.36             0.67
SP58U3               689.10      9.80             0.71
SP59                 588.22      4.74             0.88
SP59U1               588.16      4.01             0.95
SP59U2               588.03      5.34             1.00
SP60U1               585.79      6.26             1.20
SP61                   Dyke
SP62                 538.72      9.41             1.00
SP62U1               538.21      6.93             1.00
SP62U2               537.94      7.87             1.13
SP63                 623.32      8.78             1.07
SP63U2               623.68      8.65             1.30
SP63U3               623.56      8.94             1.00
SPD01                  Dyke
SPD02         UG2 weathered                Not sampled
SPD02U1               38.62      6.18             1.10
SPD03                143.13      5.19             1.74
SPD03U1   Core retained for Metallurgical Test
SPD04         Merensky Reef Hole Only
SPD05        Hole Abandoned
SPD06     Core retained for Metallurgical Test
SPD06U1              129.04      5.48             1.06
SPD07     Core retained for Metallurgical Test
SPD07U1              288.30      6.20             1.03
SPD08          UG2 potholed                Not sampled
SPD08U1              551.10      5.20             0.71